all moved! windows have been installed and caulked/insulated, a window seat has been built, shelves have been mounted, a sink was found, installed and had a special frame built for it, my desk got some reinforcement, pegboard has been mounted, the floor has been 3/4 painted, the walls have been spackled, sanded and 1/4 of the way painted.
...but still lots more to do at the new space. i'll post some before and after pics as soon as i can... it's just been super hectic with bullshit involved with moving out of the old space, lots of orders looming overhead and band stuff going down. i just finished my first small batch of stuff since i've gotten back, so i'm slowly chipping away at the pending everything.